HOME

LAW FIRM

TEAM

OFFICE PERFORMANCE

PUBLICATIONS

CONTACT

OMBUDSMAN

Key Petrobras bid opportunities – sourced from Petronect

National

Deadline for proposal

Engineering, construction, and supply for OSPLAN pumps and substation decommissioning.

23/03/2026

Engineering risk and onshore liability insurance for RNEST Train 2.

16/03/2026

Engineering, construction, and supply for OSPLAN pumps and substation decommissioning.

23/03/2026

Legal technical services for labor, civil, environmental litigation support.

30/03/2026

 

International

BOT FPSO supply and O&M for Albacora revitalization

25/05/2026

BioQAV pre-treatment unit engineering, construction, commissioning, and technical assistance.

25/05/2026

Blower equipment and services for REPLAN UFCC revamp project.

16/03/2026


Updated on MAR 09, 2026

Photo: Canva

MORE PUBLICATIONS

A more competitive spot market for Brazil’s natural gas

A more competitive spot market for Brazil’s natural gas

The proposed auction of natural gas belonging to the Union may become an important instrument for increasing short-term liquidity and developing a Brazilian spot market. One market proposal is that the gas should be offered through an independent trading platform...

Critical minerals move from energy policy to strategic trade

Critical minerals move from energy policy to strategic trade

Critical minerals are becoming a central component of international trade, industrial and security policy. A majority of the trade and economic cooperation instruments identified globally since the beginning of 2025 have addressed access to critical raw materials or...

ANP recommends discontinuing fuel formulation

ANP recommends discontinuing fuel formulation

ANP has approved a regulatory assessment recommending the discontinuation of gasoline and diesel formulation in the manner currently permitted under its regulation. The activity consists of producing gasoline or diesel through the mechanical blending of liquid...